Free Quote

Our Blog

How Do You Install Gutters on a Pergola?

How Do You Install Gutters on a Pergola?

Installing gutters on a pergola is the process of mounting a channel-and-downspout drainage system to a pergola's beams or fascia to redirect rainwater away from the structure, foundation, and living space below. This guide covers gutter type selection, structural...

Wood Look Patio Covers: Ideas & Alumawood Options

Wood Look Patio Covers: Ideas & Alumawood Options

Wood look patio covers are engineered outdoor structures that replicate the grain, texture, and warmth of natural wood while using more durable materials like aluminum, steel, or composite polymers. Alumawood is the leading brand in this category, using roll-formed...

Alumawood Pergola: Pros & Cons vs. Wood

Alumawood Pergola: Pros & Cons vs. Wood

An Alumawood pergola is an outdoor shade structure built from aluminum alloy panels embossed with a wood grain finish, engineered to replicate the look of natural timber without the upkeep demands of real lumber. A traditional wood pergola uses species like cedar,...

Alumawood Pergola: Solid vs Lattice Roof {Pros & Cons}

Alumawood Pergola: Solid vs Lattice Roof {Pros & Cons}

An Alumawood pergola roof is an aluminum patio structure engineered to replicate the look of real wood while delivering superior durability and minimal maintenance. Solid and lattice are the two primary roof styles, and each creates a fundamentally different outdoor...

DIY vs Pro Alumawood Pergola Install: Which is Best?

DIY vs Pro Alumawood Pergola Install: Which is Best?

An Alumawood pergola installation is a major outdoor living investment that requires choosing between a hands-on DIY approach and hiring a professional contractor. Each path differs significantly in cost, complexity, time commitment, and long-term structural...

How to Operate Your Louvered Alumawood Pergola

How to Operate Your Louvered Alumawood Pergola

A louvered Alumawood pergola is an adjustable outdoor roof system that uses rotating aluminum blades to control sunlight, shade, and airflow on demand. Alumawood itself is aluminum processed to resemble real wood, combining natural aesthetics with corrosion-resistant,...

What Is the ROI of Investing in an Alumawood Pergola?

What Is the ROI of Investing in an Alumawood Pergola?

Alumawood pergola ROI is the measurable return homeowners receive through increased property value, reduced long-term maintenance costs, and enhanced outdoor living functionality. Real estate estimates place pergola returns between 50% and 80% of the initial...

Metal vs Wood Pergola: Which is Best for 2026?

Metal vs Wood Pergola: Which is Best for 2026?

A metal vs wood pergola comparison comes down to how each material performs in durability, maintenance, cost, and climate resistance over the full life of the structure. Metal pergolas (primarily aluminum) offer superior longevity with minimal upkeep, while wood...

Wood vs Aluminum Pergola: Pros, Cons & Best Choice?

Wood vs Aluminum Pergola: Pros, Cons & Best Choice?

A wood or aluminum pergola is a structural outdoor addition that provides shade, style, and a defined living area; the better choice between the two depends on how each material performs across durability, maintenance, cost, and climate suitability. This guide covers...

Alumawood vs Lattice Pergola: Which Is Better?

Alumawood vs Lattice Pergola: Which Is Better?

Alumawood is an aluminum patio cover embossed with a wood grain finish, while a lattice pergola is a traditional shade structure built from natural wood species like cedar, redwood, or pressure-treated pine. Both serve as outdoor shade solutions, but they differ...

Alumawood vs Vinyl Pergola: Which is Better?

Alumawood vs Vinyl Pergola: Which is Better?

Alumawood is a wood grain-embossed aluminum pergola system, while vinyl pergolas use PVC sleeves over a structural wood core. Both materials eliminate traditional wood maintenance, but they differ significantly in heat resistance, longevity, and long-term value. This...